Ask AI on The Internet
Question: All equipment must be ___________ before repairs are performed. Cleaned thoroughly Checked for faulty wires or bad connections Isolated and completely removed from a circuit Completely taken apart
Asked by javier49
"All equipment must be isolated and completely removed from a circuit before repairs are performed." This ensures safety by preventing any accidental electrical contact or short circuits during repairs. Always follow proper lockout/tagout (LOTO) procedures to ensure equipment is safely de-energized and secured.
Think your answer is better than the AI's? Post it below.
Other Most Relevant Posts:
Ask AI: Keys should be made for LOTO devices for all employees so that production is not slowed down when repairs can be made.
True
False
Ask AI: Be sure to ______________ any used parts or equipment stored outside to prevent contamination from runoff.
Cover
Label
Repaint
Wash
Question Tags
This article was generated in part by one of OpenAI’s large-scale language-generation model, answering user javier49's question. Images were generated with OpenAI's AI model, DALL·E 3. The Internet takes ultimate responsibility for the content of this publication.
If you want your question answered by an AI, click here.
If you want your question answered by an AI, click here.
Post your own comment: